This web site refers to Nu-Lady Gold Mines. "In 1979, Nu-Lady Gold Mines Ltd. optioned the Engineer mine. In 1980, this company conducted a 15 hole diamond drilling program targeted on known vein structures accessible from the main mine. No significant intersections resulted. In 1981, a further 11 holes were drilled and a geochemical soil survey conducted over an overburden covered area in the north part of the property. Six of the holes tested northeastward extensions of the Double Decker and Engineer veins. Three holes were drilled by the Boulder vein east of the A shear and two holes were drilled to test an anomaly generated by the soil geochemical survey."