Abrasion Problems with Tiles - Need Imm Assistance !!!


Hi,

 


I am into making of tiles. The ingredients of the mix are OPC-Grey Cement & Sand (at 1:2 ratio), Water (at 0.25 to 0.28 coefficient), Super plasticizer and Colors (Synthetic pigments). These are mixed, poured into moulds (Rubber moulds & HIPS moulds), vibrated & stacked, de-molded after 24 hours, and cured for a period of 7 days. The thickness of the tile varies from 8mm to 20mm.

 


I have the following problems, which I am unable to solve and seek advice:

 


  1. My final Tile is very weak at abrasion resistance. Even if you scratch with your finger, it forms scratches, which does not disappear in spite of wiping with cloth or water. Is there any solution to increase the abrasion resistance or make it scratch proof?

 


  1. The tile is very water absorbent. If it is not coated with any sealer, and if water is allowed to stay on it for certain period till it dries, it leaves patches which are permanent.

 


  1. I am coating my tile with epoxy & acrylic sealers (spray coating & sponge coating), which has solved the problem of water seepage and patch formation. But the abrasion resistance has gone even worse as the coating film formed on the tile gives out very easy scratches. How to solve this?

 


I need the solution to make my tile scratch / abrasion resistant, water-proof, and glossy. Please help me out with your valuable experience & expertise, as the deadlines to deliver the product is fast approaching

 


Thanks & regards

 


George Hart

Share Send to a friend Watch Report
 
 

Posted Answers

Order by
 

main problem is that u have nt mix the cement properly or the cement was expired


Posted 9 months ago ( permalink )
In reply to cary300's question
Rated as
#1 out of 2
0
0

Helpful?

line
line
line



 
Saegespaene
(deleted account)

It would appear that you are not achieving the correct water-to-cement ratio....   You say that you are adding water with a 0.25 - 0.28 'coefficient.' Just what do you mean by that?   Typically, a given weight of Portland Cement requires a

minimum of 40% water (by weight) to be able to achieve proper crystallization.   If you are using less, you are making it impossible for all the cement to harden, and you are already aware of the negative results that can be observed......

Posted 9 months ago ( permalink )
In reply to cary300's question
Rated as
#2 out of 2
0
0

Helpful?

line
line
line



Sign in to participate

Got an answer for cary300? Would you like to comment on the posted answers, or vote for the one which you think is the best?

Sign up for a free account, or sign in (if you're already a member).

Explore Related Questions

Other people asked questions on similar topics, check out the answers they received:


Do We Get Presently Get Water From Meteorites (which land on earth)?

I have a penny bet with a friend. He claims that meteorites bring fresh water to the earth all the time. I believe that we live ...
Submitted by Cynthia 2 months ago
  • viewed 151 times

Last answer posted 2 months ago by RB34


Gray Water

What does the term gray water mean and what is this type of water used for?
Submitted by buckeye 3 months ago
  • viewed 286 times

Last answer posted 12 days ago by Bob K


Water in cans

why isn't water sold in cans?
Submitted by james 3 months ago
  • viewed 306 times

Last answer posted 3 months ago by james



» More...

Feed - Subscribe to changes to this Q&A Blog
Copyright © 2006-2008, Yedda Inc. and respective copyright owners · CC License